Program
DSN
- Payloads
- 3
- In orbit
- 3
- Operational (CelesTrak)
- 3
- Re-entered
- 0
- First launch
- 2017-01-24
- Latest launch
- 2024-11-04
Owners
Built by
- MELCO/NECST2
- Mitsubishi Electric Co.1
Payloads in this program
| Name | Status |
|---|---|
| DSN-2 | Operational |
| SUPERBIRD-B3 | Operational |
| DSN-3 (KIRAMEKI-3) | Operational |
From GCAT by Jonathan McDowell (CC BY 4.0). Roles are counted from the catalogue itself, not from GCAT type labels, which GCAT describes as patchy. About this source